Joss reported the flood-level mismatch before breakfast.
Pate checked her arithmetic, found the same answer, and sent the marked elevations through dispatch. They didn’t enter the lower corridor. They didn’t wait until the assessment to make the discovery dramatic. The reply came half an hour later: first feed point isolated, inventory crew entering by the upper lift, lower release suspended pending survey.
Joss wrote the reply number beneath the warning.


